PROFESSIONAL TEAM FOR DEVELOPMENT AND EXPLOITATION OF THE DEPOSIT OF SOLID MINERALS
15 YEARS IN BUSINESS
We did this enough to learn and master a lot in the mining industry of the Republic of Kazakhstan, and are ready to offer our experience and vision to all interested persons.
PRACTICAL PROFESSIONALISM
Our specialists solve their production tasks on a daily basis.
Our advantage is not only a good theoretical base, but also a vast practical experience.
OPTIMIZATION OF
EXPENSES, INCREASE
OF INCOMES
Our team constantly implements something in technologies and processes for efficient use of resources, due to this we can provide a more competitive price.
PRINCIPLES OF OUR WORK
WHAT IS CHECKED BY US
The success of any project depends on a large number of influencing factors. Thanks to our accumulated experience, professional connections, and innovative solutions, we will be able to bring the project of any complexity to a mutually beneficial result.
EXCELLENT TEAM, MAXIMUM RESULTS
We have a staff of first-class specialists on any issues and in various spheres of life, we cooperate with state structures, and working relations with the industry business community.
PURPOSEFULNESS, PROFITABILITY
Together with our customers and partners, with the help of our knowledge, experience and hard work, we have mastered over 25 million US dollars and have earned over 30 million US dollars.
SCALE AND MOBILITY
The company has more than 200 employees at various sites and projects. We are large for solving large problems. But they are also mobile for quick response in more point processes.
ANALYTICS
We use advanced technologies, regulations, optimal business processes for maximum efficiency in our work.
GUARANTEES OF OUR AFFAIRS
As an appendix to our words, and a sample of our professionalism, we own our own functioning deposits.
In aggregate, having more than 10 years of uninterrupted, successful work.
OUR SERVICES:
OUR SERVICES:
If you are the owner of a mining company or a subsoil use contract.
We will help you:
• With the development of drafts of work and obtaining appropriate approvals, and permission from the competent authorities;

• With the organization and support of geological works and exploration;

• with the organization of mining, capital and mining operations, including complex mining in geological conditions;

• with engineering, construction, start-up and operation of enrichment facilities;

• In search of investments for modernization of old ones and launch of new projects;

CONTACT US
If you are the head of a mining company, and something in the work goes wrong.
We will help you:
• with debugging of specific business processes and technological processes;

• with the organization of effective work of the main and auxiliary services, and their interaction;

• with the establishment of documentary support and accounting, including in the conditions of shift work method;

• with the organization of communication with all interested parties.
CONTACT US
OUR PARTNERS
we value our relationship, and have a good reputation
OUR PROJECTS:
The "Stepnyak" / "Zhanalyk GOLD" LLP
Website: www.resources.kz
Realization of the project in the period from 2005-2017.
Our share of participation in the project 45%
The company itself was founded in 2003.

The subsoil use contract was concluded in 2003.

The project was implemented in the period from 2003 to 2017 at the Zhanalyk field in the Akmola region. (65 km to the north-east from the town of Shchuchinsk) (gold-polymetallic ores), including actual exploration.

Since 2009, pilot industrial factory with a capacity of 60,000.0 tons of ore per year for flotation technology has been commissioned.

It has been transferred to the production stage since 2012

Investments in the project amounted to $ 7,000,000.00 (including own funds $ 4,200,000.00)

The development of the deposit was carried out in an open pit (quarry).

Products gold-silver-containing lead concentrate KC-4. Was realized fully at LLP "KAZZINK".

For the period of Stepnyak's work 18,763.4 CMT of concentrate for the amount of $ 33,095,000.00 was produced.

In 2017, due to the depletion of reserves, the deposit is conserved. Measures are being taken to find raw materials. At the moment, Pilot industrial factory is being leased.



Project "Zerenda" / "GPK Gorizont" LLP
Website: www.horizon.kz
The project is being implemented since 2008.
Our share of participation in the project 45%
The company was founded in 2005.

It has been in operation since 2008 at the Berezovskoye deposit in the Akmola region. (25 km to the north of Kokshetau) (polymetallic gold-silver-bearing ores), including actual exploration. The procedure of transferring to the production stage is carried out by the end of this year. Approximate working time is 6-7 years.

Since 2017, Pilot industrial factory with a capacity of 150,000.0 tons of ore per year has been commissioned on flotation technology with cyanidation of the concentrate and obtaining the alloy DORE.

Initial technical plan was revised in May 2017.

Investments in the project amounted to $ 11,000,000.00, (including own funds $ 9,000,000.00)

The development of the deposit is carried out in an open pit (quarry).

Now, gold-silver-containing lead concentrate KS-4 is produced, and gold-silver containing concentrate.

All products are sold at LLP "KAZZINK".

During the period of the Zerenda project (June 2017 to July 2018) 1,372.5 CMT of concentrate was produced for the amount of $ 2,750,000.00.

Projects "Zhorga", "Karaozek", "Tassu", "Bekbosyn" / "Prime Metals LLP" LLP
Website: www.prospector.kz
Our share of participation in the project 65%
The entire area of East Balkhash-1 (250 km to the north-east from Balkhash town) is conditionally divided into two parts, some areas mainly with copper-porphyry mineralization ("Karaozek", "Bekbosyn", "Tassu") projects and areas with gold mineralization ("Zhorga" project).

Many aspects, including environmental and social ones, that can affect the success of the project were investigated. A strategy and a specific list of necessary actions and activities had been defined.

For projects of "Karaozek", "Tassu" and "Bekbosyn", the discovery of a large or even unique copper deposit is expected.

Under the "Zhorga" project, a search is being made to finance the construction and start-up of the ore processing complex for the processing of gold-bearing ores at the sites of Zhorga IV and Sholadyr.

Proved ore reserves in these areas amount to 2,518,000.0 tons containing 5,053.0 kg. of gold, with an average content of 2.01 g / t., which is sufficient for a cost-effective working period of more than 6-7 years.

There are also estimated resources of sites, 1,236,000.0 tons of ore, containing 2 465.0 kg. of gold, with an average content of 1.99 g / t.

Comprehensive work was carried out to study ore for ore dressability, an analysis of available technologies was carried out.

It is planned to build a factory for ore processing by flotation technology, with gravitational processing of tailings of flotation, and, subsequently, cyanidation of the obtained collective concentrate using CIP technology. The technological process of enrichment and production chosen by the company differs relative simplicity and reliability, which explains its wide application.

Near surface occurrence of ore bodies, as well as favorable hydrogeological conditions and high geotechnical properties of the constituent ore and overburden, determined the design solution for open-pit mining.

To date, slightly more than 6.0 million US $ has been invested.

IF YOU ARE LOOKING FOR INVESTMENT OPPORTUNITIES, WE HAVE OFFER!